In 2011, PanAust Ltd requested orelogy to create a Life of Mine schedule for their Copper-Gold mine in Laos, utilising the pit designs for this operation from 2011.
The scheduling taken into consideration multiple destinations for waste, multiple haul routes (usually two haul routes available out of pit), trucking predictions, and Ore /Cu Con predictions for comparison with the existing Minemax strategic schedule.